A Corner Piece of a Prestigious Project in Tel Aviv
Another design from MYS Architects, found on the corner of Yitzhak Sadeh and HaMasger street in Tel Aviv. The tower is part of the Yitzhak Sadeh CBD complex.
The construction of the tower was begun in 2015 and finished in 2021. With 32 floors above ground and five floors below ground, the tower measures 140 meters.

[…] Read the final part: Working Creatively With the Three Exposure Controls – ISO […]
[…] Read the next part: Working Creatively With the Three Exposure Controls – Aperture […]
[…] Read the next part: Working Creatively With the Three Exposure Controls – Shutter Speed […]